사업분야

길의 문화창달에 (주)용마엔지니어링이 주역이 되겠습니다.

HOME사업분야해외사업

해외사업

주요실적

business_everseasbusiness_1.jpg

해외사업부문
구분발  주  청계 약 기 간금액(VAT제외)
단위:천원
사업명
타당성조사
/
실시설계
NHAI : National Highways Authority of India′17.06 ~′21.05364,800Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna in the State of Odisha, Chhattisgarh & Andhra Pradesh.(Lot-3/Odisha & Jharkhand/ Package-2) for total length 99.629Kms in Andhra Pradesh Section.
NHAI : National Highways Authority of India′17.06 ~′21.111,066,352Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna in the State of Odisha, Chhattisgarh & Andhra Pradesh. (Lot-3/Odisha & Jharkhand/Package-2) for total length 240.372 Kms in Odisha Section including 2 nos. of Tunnels in Odisha.
NHAI : National Highways Authority of India′17.06 ~′22.05806,400Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3/0disha & Jharkhand/Package-2) for Chhattisgarh Section
NHAI : National Highways Authority of India'18.04 ~ ‘21.10294,400Consultancy Services for preparation of Feasibility Study/ Detailed Project Report of selected road stretches road for upgradation 2/4 lane NH connectivity under Sagarmala scheme for balance length of 80 Km. from Haveri-Yekambi-Sirsi (Approved alignment 74.98 km) Package No. NHAI/PC/SM/04 in the State of Karnataka
NHAI : National Highways Authority of India'11.01 ~ '20.08497,600Preparation of Feasibility Study and Detailed Project Report for wideninig/ 6 laning/upgradation of existing 4 lane section of Narmada Bridge & its approaches from km 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8 and value addition works to Vadodara to Bharuch & Bharuch to Surat Secztion of NH-8
감리NHAI : National Highways Authority of India'17.05 ~ '21.02947,200Consultancy Services for Authority’s Engineer for Supervision of the Project of Construction of Four Laning of UP/Haryana Border-Yamunanagar- Saha- Barwala- Panchkula section of NH-73 from km 160.357 to km 179.249 (Design km 157.192 to km 176.400) in the State of Haryana on (EPC) Basis (Package-3) on EPC mode
NHAI : National Highways Authority of India'12.11 ~ '21.011,470,400Consultancy Services for Independent Engineer for Four Laning of Krishnagar-Bahrampore Section of NH-34 from Km 115.00 to 193.00 in the state of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer on Annuity (“BOT Annuity”) Basis (Package No.: NHDP-III/BOT/WB/02)
NHAI : National Highways Authority of India'17.06 ~ '21.031,168,000Consultancy Services for Independent Engineer for Construction of 4-Lane (Partial Access Controlled) Laddowal Bypass from 0.00 to Km 17.041 linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the state of Punjab on Hybrid Annuity Mode.
The government of the republic of Indonesia ministry of public works '12.11 ~ '21.06USD 2,555mil.
IDR 66,443mil.
Western Indonesia National Roads Improvement Project(WINRIP) Technical Assistance for Core Team Consultant(CTC) to Support the Project Management Unit under IBRD Loan No. 8043-ID